[1] |
邓凯. 预装式变电站在电力行业的运用[J]. 低碳世界, 2019,9(11):111-112.
|
|
DENG Kai. Application of prefabricated substation in power industry[J]. Low Carbon World, 2019,9(11):111-112.
|
[2] |
陈卫国, 戴俊. 110 kV及以下预装式变电站设计[J]. 电气技术, 2019,20(4):118-120.
|
|
CHEN Weiguo, DAI Jun. Design for 110 kV and below prefabricated substation[J]. Electrical Engineering, 2019,20(4):118-120.
|
[3] |
井伟, 肖少非, 杨店飞. 电网物资出厂试验抽检标准化管理体系建设[J]. 中国设备工程, 2018(22):28-29.
|
|
JING Wei, XIAO Shaofei, YANG Dianfei. Construction of a standardized management system for the random inspection of power grid materials[J]. China Equipment Engineering, 2018(22):28-29.
|
[4] |
王金虎. 江苏电力物资质量检测体系优化研究[J]. 中国市场, 2016(2):54-55.
|
|
WANG Jinhu. Research on the data center program of power grid enterprises[J]. China Market, 2016(2):54-55.
|
[5] |
王维英, 王立杰. 工程机械回转接头出厂试验系统设计与仿真[J]. 机床与液压, 2020,48(10):128-131.
|
|
WANG Weiying, WANG Lijie. Design and simulation of hydraulic test system for factory test of engineering machinery rotary join[J]. Machine Tool & Hydraulics, 2020,48(10):128-131.
|
[6] |
胡良蓉, 骆虎, 魏泉, 等. 一种智能开关设备的集成及试验研究[J]. 高压电器, 2015,51(4):62-66.
|
|
HU Liangrong, LUO Hu, WEI Quan, et al. Research of integration and test for an intelligent switchgear[J]. High Voltage Apparatus, 2015,51(4):62-66.
|
[7] |
林翠婷, 欧小波. 110 kV变压器出厂试验负载试验超标原因分析[J]. 绝缘材料, 2015,48(5):65-68.
|
|
LIN Cuiting, OU Xiaobo. Over standard analysis of load test for 110 kV transformer[J]. Insulating Materials, 2015,48(5):65-68.
|
[8] |
郭廷冬. 箱式变电站温升试验方法研究[J]. 质量技术监督研究, 2018(6):41-44.
|
|
GUO Yandong. Research on temperature rise test method of prefabricated substations[J]. Quality and Technical Supervision Research, 2018(6):41-44.
|
[9] |
张风奇, 张风彦, 车军. 基于AT89C52单片机10 kV交流耐压试验台的设计[J]. 电源技术, 2012,36(4):558-560.
|
|
ZHANG Fengqi, ZHANG Fengyan, CHE Jun. Design of 10 kV AC withstanding voltage test stand based on AT89C52 single chip microcontroller[J]. Chinese Journal of Power Sources, 2012,36(4):558-560.
|
[10] |
张永强, 郭诚, 张豪俊, 等. 基于网络数字化管理的气体绝缘金属封闭开关设备出厂试验数据系统[J]. 电气技术, 2019,20(5):64-68.
|
|
ZHANG Yongqiang, GUO Cheng, ZHANG Haojun, et al. GIS factory test data system based on network digital management[J]. Electrical Engineering, 2019,20(5):64-68.
|
[11] |
王欣, 孙鹏. 智能变电站中指针式仪表图像自动识别方法[J]. 电气技术, 2016(5):7-10.
|
|
WANG Xin, SUN Peng. Automatic identification method of the pointer instrument in intelligent substation[J]. Electrical Engineering, 2016(5):7-10.
|
[12] |
孙毅, 蔡杰. 智能水电厂一体化平台数据建模[J]. 水电厂自动化, 2018,39(1):55-57.
|
|
SUN Yi, CAI Jie. Data modeling of integrated platform of smart hydropower plant[J]. Hydropower Plant Automation, 2018,39(1):55-57.
|
[13] |
李信鹏, 刘威. 电网企业数据中台方案研究[J]. 电力信息与通信技术, 2020,18(2):1-8.
|
|
LI Xinpeng, LIU Wei. Research on the scheme of data center for grid enterprises[J]. Electric Power Information and Communication Technology, 2020,18(2):1-8.
|
[14] |
陈志勇. 智能电网的大数据处理技术应用[J]. 集成电路应用, 2020,37(2):78-79.
|
|
CHEN Zhiyong. Application of big data processing technology in smart grid[J]. Application of IC, 2020,37(2):78-79.
|
[15] |
蒋一翔, 虞文进. 基于B/S和C/S混合架构的电网数据自动检测系统[J]. 自动化与仪器仪表, 2020(9):173-177.
|
|
JIANG Yixiang, YU Wenjin. Grid data automatic detection system based on B/S and C/S hybrid architecture[J]. Automation & Instrumentation, 2020(9):173-177.
|
[16] |
吴路明, 薛明军, 陈琦, 等. 一起电子互感器异常引发的复杂发展性故障分析及改进[J]. 华电技术, 2020,42(6):10-15,30.
|
|
WU Luming, XUE Mingjun, CHEN Qi, et al. Analysis and optimization for complex developing faults caused by abnormal electronic transformers[J]. Huadian Technology, 2020,42(6):10-15,30.
|
[17] |
张宪军, 赵谦, 梁志宝, 等. 智能变电站交换机基于GOOSE管理技术设计与实现[J]. 华电技术, 2020,42(2):42-49,57.
|
|
ZHANG Xianjun, ZHAO Qian, LIANG Zhibao, et al. Design and implementation of GOOSE management technology on smart substation switches[J]. Huadian Technology, 2020,42(2):42-49,57.
|
[18] |
赵龙, 岳义博. 大型储能电站智能辅助调试系统的设计及应用[J]. 华电技术, 2019,41(11):53-56.
|
|
ZHAO Long, YUE Yibo. Design and application of intelligent auxiliary debugging system for large-scale energy storage power station[J]. Huadian Technology, 2019,41(11):53-56.
|
[19] |
蔡亮亮, 龚世敏, 唐斌, 等. 智能变电站虚拟后备测控单元自动投退及无缝切换技术研究[J]. 华电技术, 2019,41(10):30-34.
|
|
CAI Liangliang, GONG Shimin, TANG Bin, et al. Research on automatic and seamless switching technology for virtual backup measurement and control units in smart substations[J]. Huadian Technology, 2019,41(10):30-34.
|