华电技术 ›› 2008, Vol. 30 ›› Issue (5): 15-18.

• 专题综述 • 上一篇    下一篇

1000MW超超临界机组在试运行中存在的问题及处理方法

张新春   

  1. 华电国际邹县发电厂,山东 邹城
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2008-05-25 发布日期:2008-05-25
  • 通讯作者: 张新春

The Problems Existing in Commissioning of 1000MW Ultra-supercritical Unit and the Solutions

ZHANG Xin-chun   

  1. Huadian Power International Co., Ltd., Zouxian Power Plant,Zoucheng 273522,China
  • Received:1900-01-01 Revised:1900-01-01 Online:2008-05-25 Published:2008-05-25
  • Contact: ZHANG Xin-chun

摘要: 介绍了华电国际邹县发电厂四期工程1000MW超超临界机组的特点,论述了机组在调试过程中出现的问题及解决方法,总结了超超临界汽轮机总启动期间的注意事项,以期对同类型机组的建设和调试有一定的借鉴意义。

关键词: 1000MW超超临界机组, 试运行, 问题, 解决方法

Abstract: The features of the 1000MW ultra-supercritical unit of the phase Ⅳ project in Huadian International Zouxian power plant were introduced. The problems appeared during commissioning process and their solutions were discussed. Some matters needed to paying attention during total start-up period of ultra-supercritical turbine were summed up. It is expected that this article will be referable for construction and commission of the same type units by author.

Key words: 1000MW ultra-supercritical unit, trial operation, problem, solution