1000MW机组启动备用电源引接方案选择

  

  1. 国家电投集团河南电力有限公司 技术信息中心,郑州〓450000
  • 出版日期:2016-08-25 发布日期:2016-10-31

1000 MW unit start backup power tapping plan selection

  1. Center for Technology and Information, State Power Investment Corporation Henna Electrical Power Company Limited, Zhengzhou 450000, China
  • Online:2016-08-25 Published:2016-10-31

摘要:

摘要:以焦作丹河电厂异地扩建工程为例,结合项目所处地理位置、在电网中的地位及电厂外部启动备用电源引接条件等,提出了4个方案。通过技术和经济上的比较,确定了最优方案。

关键词:

Abstract:

Abstract:This paper took Jiaozuo Danhe Power Plant extension project as example, combined with site location, position in grid and outside start/backup power tapping condition, four tapping plans were indicated. By technical and economic comparison, the best plan was confirmed. 