湿法脱硫运行与维护中存在的问题

童罡 邓永忠   

  1. 湖南华电长沙发电有限公司,湖南长沙410203
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2009-01-25 发布日期:2009-01-25

The problems in operation and maintenance of wet desulphurization system

TONG Gang,DENG Yongzhong   

  1. Hunan Huadian Changsha Power Generation Corporation Limited, Changsha 410203, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-01-25 Published:2009-01-25

摘要: 研究了某发电公司600MW超临界燃煤机组应用石灰石-石膏湿法烟气脱硫中遇到的几个实际问题,重点讨论分析了粉尘浓度、吸收塔溢流、工艺设计等对脱硫系统运行与维护所产生的影响,对脱硫系统运行中存在的问题提出了几项整改措施。

关键词: 脱硫系统, 湿法烟气脱硫, 粉尘浓度, 吸收塔溢流, 工艺设计, 运行与维护, 整改措施

Abstract: Some practical problems occurred in wet limestonegypsum method FGD system of a certain power generation corporation were researched. The influences of dust concentration, absorption tower overflow and process design on operation and maintenance of desulphurization system were discussed emphatically. Aiming at the problems, several rectification measures were proposed.

Key words: desulphurization system, wet flue gas desulphurization, dust concentration, absorption tower overflow, process design, operation and maintenance, rectification measure