摘要: 新建电厂输煤系统设计不够合理,系统中的部分设备运行时出现许多问题且存在安全隐患。对出现的问题进行了分析和讨论,结合现场实际情况提出了治理方法,以确保系统设备安全运行。
关键词: 输煤系统, 优化设计, 安全运行, 环保
Abstract: The design of the coal handling system of a newlybuilt power plant is not rational, many problems occurred in some equipments operation, and there are potential safety hazards to the system. The problems were analyzed and discussed. Combining with site practical situations, the treatment methods were put forward to ensure the safe operation of the system.
Key words: coal handling system, optimized design, safe operation, environmental protection
关绍江;王伟;代淑香. 2×300MW机组输煤系统优化设计与改造[J]. 华电技术, 2011, 33(6): 16-18.
GUAN Shaojiang;WANG Wei;DAI Shuxiang. Optimized design and reformation for coal handling system of 2×300MW unit[J]. Huadian Technology, 2011, 33(6): 16-18.