华电技术 ›› 2012, Vol. 34 ›› Issue (3): 33-34.
• 研究与开发 • 上一篇 下一篇
刘玉安1,陆贤1,吴龙1,郭强2
收稿日期:
修回日期:
出版日期:
LIU Yuan1, LU Xian1, WU Long1, GUO Qiang2
Received:
Revised:
Published:
摘要: 早期火电厂排水系统缺少综合利用措施,厂区废水回用率低。以黄桷庄电厂为实例,对原排水系统提出了改造方案,以探索最优改造途径。
关键词: 废水回用率, 排水系统, 优化改造, 综合利用
Abstract: There were not multipurpose use measures in the early sewer systems of thermal power plants, the wastewater reuse rate of the plants is lower. Taking the Huangjuezhuang Power Plant as example, a reformation scheme of the original sewer system was put forward. The purpose of the scheme is to search after optimal way of sewer system reformation.
Key words: wastewater reuse rate, sewer system, optimized reformation, multipurpose use
刘玉安;陆贤;吴龙;郭强. 火电厂排水系统的技术改造[J]. 华电技术, 2012, 34(3): 33-34.
LIU Yuan;LU Xian;WU Long;GUO Qiang. Technical reformation of sewer system of thermal power plant[J]. Huadian Technology, 2012, 34(3): 33-34.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.hdpower.net/CN/
https://www.hdpower.net/CN/Y2012/V34/I3/33