[1] |
王恒栋. 我国城市地下综合管廊工程建设中的若干问题[J]. 隧道建设, 2017, 37(5):523-528.
|
|
WANG Hengdong. Several problems about urban underground utility tunnel during construction in China[J]. Tunnel Construction, 2017, 37(5):523-528.
|
[2] |
刘中正. 城市地下综合管廊工程建设思考[J]. 科技创新与应用, 2022, 12(34):103-106.
|
|
LIU Zhongzheng. Thinking about the construction of urban underground integrated pipeline corridor project[J]. Technology Innovation and Application, 2022, 12(34):103-106.
|
[3] |
张子钰. 城市地下综合管廊定价模型及实证研究[J]. 地下空间与工程学报, 2018, 14(2):299-305.
|
|
ZHANG Ziyu. A pricing model of city underground pipe gallery and its practise[J]. Chinese Journal of Underground Space and Engineering, 2018, 14(2):299-305.
|
[4] |
孙纪康, 张智超, 王美娜, 等. 关于综合管廊有偿使用收费测算方法及存在问题的讨论[J]. 市政技术, 2020, 38(4):281-284.
|
|
SUN Jikang, ZHANG Zhichao, WANG Meina, et al. Calculation method and existing problems of the utility tunnel collection[J]. Municipal Engineering Technology, 2020, 38(4):281-284.
|
[5] |
乔柱, 刘伊生, 张宏, 等. 综合管廊有偿使用的收费定价研究[J]. 地下空间与工程学报, 2018, 14(2):306-314.
|
|
QIAO Zhu, LIU Yisheng, ZHANG Hong, et al. Charge pricing research on paid-use of comprehensive utility tunnel[J]. Chinese Journal of Underground Space and Engineering, 2018, 14(2):306-314.
|
[6] |
姬永红, 殷仕睿, 张琪, 等. 综合管廊有偿使用收费方式及其适用性探究[J]. 城市道桥与防洪, 2020(11):143-148.
|
|
JI Yonghong, YIN Shirui, ZHANG Qi, et al. Exploration on charging method and its applicability for compensated use of utility tunnel[J]. Urban Roads,Bridges & Flood Control, 2020(11):143-148.
|
[7] |
LI L, GUO X, LI D, et al. Cost allocation model of power pipeline access corridor based on group decision and spatial proportion method[C]// Journal of Physics: Conference Series. IOP Publishing, 2020, 1650(3): 032031.
|
[8] |
赵亚娟, 郁春松. 基于改进两部制的综合管廊PPP项目定价研究[J]. 安徽建筑大学学报, 2020, 28(4):57-64.
|
|
ZHAO Yajuan, YU Chunsong. Pricing research on PPP project of utility tunnel based on improved two part tariff[J]. Journal of Anhui Jianzhu University, 2020, 28(4):57-64.
|
[9] |
王如钰. 城市地下综合管廊收费定价模型研究[D]. 广州: 华南理工大学, 2020.
|
|
WANG Ruyu. Research on the pricing model of urban underground utility tunnel[D]. Guangzhou: South China University of Technology, 2020.
|
[10] |
付雅姝. 基于三方满意的综合管廊PPP项目入廊定价机制研究[D]. 重庆: 重庆交通大学, 2019.
|
|
FU Yashu. Research on the pricing mechanism of utility tunnel under PPP model based on three-party satisfaction[D]. Chongqing: Chongqing Jiaotong University, 2019.
|
[11] |
董爱. 城市综合管廊PPP项目政府补贴测算模型研究[D]. 北京: 北京建筑大学, 2020.
|
|
DONG Ai. Research on government subsidy measurement model of urban integrated pipe corridor PPP project[D]. Beijing: Beijing University of Civil Engineering and Architecture, 2020.
|
[12] |
王柏峰. 地下综合管廊PPP项目定价和调价机制研究[D]. 武汉: 武汉理工大学, 2018.
|
|
WANG Baifeng. Study on pricing and price adjustment mechanism of urban utility tunnel use PPP mode[D]. Wuhan: Wuhan University of Technology, 2018.
|
[13] |
FANG J, WANG B F, ZHANG Y, et al. Study on the price forming mechanism of the urban utility tunnel using PPP mode[J]. DEStech Transactions on Engineering and Technology Research, 2017:18336.
|
[14] |
许晶伟. 综合管廊PPP项目核心利益相关者利益协调研究[D]. 长沙: 长沙理工大学, 2021.
|
|
XU Jingwei. Study on the coordination of core stakeholders' interests in integrated pipe corridor PPP projects[D]. Changsha: Changsha University of Science & Technology, 2021.
|
[15] |
周漩, 张凤鸣, 惠晓滨, 等. 基于信息熵的专家聚类赋权方法[J]. 控制与决策, 2011, 26(1):153-156.
|
|
ZHOU Xuan, ZHANG Fengming, HUI Xiaobin, et al. Method for determining experts' weights based on entropy and cluster analysis[J]. Control and Decision, 2011, 26(1):153-156.
|
[16] |
DELGADO A, ROMERO I. Environmental conflict analysis using an integrated grey clustering and entropy-weight method: A case study of a mining project in Peru[J]. Environmental Modelling & Software, 2016, 77: 108-121.
|
[17] |
陈甜甜, 高亚静, 卢占会. 基于双尺度度量的改进模糊均值曲线聚类方法研究[J]. 综合智慧能源, 2022, 44(4): 1-11.
doi: 10.3969/j.issn.2097-0706.2022.04.001
|
|
CHEN Tiantian, GAO Yajing, LU Zhanhui. Research on improved fuzzy mean curve clustering method based on two-scale measurement[J]. Integrated Intelligent Energy, 2022, 44(4): 1-11.
doi: 10.3969/j.issn.2097-0706.2022.04.001
|
[18] |
SAATY T L. Decision making with the analytic hierarchy process[J]. International Journal of Services Sciences, 2008, 1(1): 83-98.
doi: 10.1504/IJSSCI.2008.017590
|
[19] |
DIAKOULAKI D, MAVROTAS G, PAPAYANNAKIS L. Determining objective weights in multiple criteria problems: The critic method[J]. Computers & Operations Research, 1995, 22(7): 763-770.
doi: 10.1016/0305-0548(94)00059-H
|