摘要: 介绍了发电厂辅机变频改造的意义。对变频调速系统的电气接线方案进行了分析和研究,比较2种电气接线的方式后,建议采用1拖2方案。这样,变频调速系统可使发电厂辅机达到最佳运行状态,提高了设备的运行效率,以达到节能之目的。

关键词: 发电厂辅机, 变频调速系统, 电气接线, 比较

Abstract: The significance of auxiliaries variable frequency reformation was presented. The electrical connection schemes of variable frequency speed control system were analyzed and studied. According to the comparison between two electrical connection schemes, the scheme of One Towing Two was recommended. Then the auxiliaries of power plant operated at optimum status by using the variable frequency speed control system, the equipment operation efficiency was raised, and the purpose of energysaving was realized.