600MW超临界机组设计优化探讨

陈乔伟,王俊启   

  1. 三门峡华阳发电有限责任公司,河南 三门峡 472143
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2008-02-25 发布日期:2008-02-25
  • 通讯作者: 陈乔伟

Discussion of the 600MW supercritical unit design optimization

CHEN Qiao-wei, WANG Jun-qi   

  1. Sanmenxia Huayang Power Generation Co., Ltd., Sanmenxia 472143, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2008-02-25 Published:2008-02-25

摘要: 以某2×600MW超临界机组工程为例,从确保机组投运后能够安全、经济、可靠、环保运行的角度出发,针对汽机油系统、主设备附件、疏水系统、辅机及系统等方面存在的问题提出了优化方案;同时对真空泵、循环泵等重要辅机投产后的故障进行了分析,提出了相应的处理建议。

关键词: 超临界机组, 汽机设备, 汽机系统, 设计优化

Abstract: In view of 2×600 MW supercritical units, optimized schemes for the problems accrued in oil system, main equipment appendix, draining system, and auxiliary system were put forward, which is sure to keep safe, economical, reliable and environmental performance. Meanwhile the problems occurred in vacuum pump, circulating pump and other important auxiliary equipments that putting into production were analyzed, and related advice was supplied.

Key words: supercritical unit, steam turbine equipment, steam turbine system, design optimization