华电技术 ›› 2008, Vol. 30 ›› Issue (6): 68-70.

• 节能与环保 • 上一篇    下一篇

一种新型的火电厂渣水处理系统

徐奇峰1,文明2   

  1. 1.浙江省电力建设有限公司,浙江 宁波315010;2.温州发电有限责任公司,浙江 温州325000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2008-06-25 发布日期:2008-06-25

A New Treatment System for Flushing Slag Water of Thermal Power Plant

XU Qi-feng1, WEN Ming2   

  1. 1. Zhejiang Electric Power Construction Co., Ltd., Ningbo 315010, China; 2. Wenzhou Power Generation Co., Ltd., Wenzhou 325000, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2008-06-25 Published:2008-06-25

摘要: 介绍了新型渣水处理系统的污水净化原理和工艺流程。渣水处理系统污水净化的核心是絮凝沉降,控制好加药量是污水净化处理的关键点。通过试验,确定了最佳混凝剂量,达到了良好的混凝效果。详细论述了新型渣水处理系统在温州电厂使用的情况。

关键词: 渣水处理系统, 污水净化原理, 工艺流程, 加药量

Abstract: The principle and process flow of a new treatment system of flushing slag water were introduced. The core technology of waste water purification for flushing slag water treatment system is flocculation and sedimentation, and the key point is control of addition dosage. The optimum flocculent quantity was determined by experiments and the good flocculation was obtained. The application of the flushing slag water treatment system in Wenzhou Power Plant was described in detail.

Key words: treatment system of flushing slag water, principle of waste water purification, process flow, addition dosage