国产1000MW汽轮发电机的安装与调试

张新春   

  1. 华电国际邹县发电厂,山东 邹城 273522
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2008-08-25 发布日期:2008-08-25

The erection and commission of 1000MW domestic turbo-generator

ZHANG Xin-chun   

  1. Zouxian Power Plant, Huadian Power International Corporation Limited, Zoucheng 273522, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2008-08-25 Published:2008-08-25

摘要: 介绍了我国自主生产的首台1 000MW汽轮发电机组的特点,从安装、调试方面详细论述了在发电机严重滞后的情况下,汽轮发电机组本体安装工作的组织和管理,论证了在发电机不就位的情况下进行汽轮机扣缸的可行性,以及需要采取的措施。

关键词: 超超临界发电机组, 1000MW机组, 施工方案, 国产化

Abstract: The feature of the first domestic turbo-generator was described. The organization and management of turbo-generator erection and commission while the generator delivery was lagged seriously were expounded in detail. The feasibility of condenser covering while the generator is not in location was proofed, and the measures must be adopted were given too.

Key words: ultra-supercritical generation unit, 1000MW unit, construction plan, domestic participation