华电技术 ›› 2009, Vol. 31 ›› Issue (1): 21-22.

• 专题综述 • 上一篇    下一篇

水电站集水井抽水控制装置的改进措施

周玉玲 郑小琴   

  1. 浙江省江山市碗窑水库管理局须江电站,浙江,江山,324100
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2009-01-25 发布日期:2009-01-25

Improvement measure of pump water control device of collecting well in hydropower station

ZHOU Yuling,ZHENG Xiaoqin   

  1. Xujiang Hydropower Station of Zhejiang Jiangshan Wanyao Reservoir Administrative Bureau, Jiangshan 324100, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-01-25 Published:2009-01-25

摘要: 水电站集水井的排水顺畅是电站正常运行的重要保证。分析了某水电站集水井存在的问题,通过采用计算机控制系统与电站常规控制系统相结合的改造方法对其进行了改造,取得了良好的经济效益。

关键词: 水电站, 集水井, 自动控制, 改造

Abstract: Smooth drainage of collecting well in hydropower station is important to ensure the station normal operation. The problems existed in collecting well of a hydropower station were analyzed, the technical reformation was accomplished by combining the conventional control system of the power station with computer control system, and excellent economic benefit was obtained.

Key words: hydropower station, collecting well, automatic control, reformation