华电技术 ›› 2009, Vol. 31 ›› Issue (2): 16-18.

• 专题综述 • 上一篇    下一篇

小舜江泵站电气设备改造浅析

吴春刚,施练东   

  1. 绍兴市汤浦水库有限公司,浙江上虞 312364
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2009-02-25

Analysis of reformation of electrical equipment in Xiaoshunjiang Pump Station

WU Chungang, SHI Liandong   

  1. Shaoxing Tangpu Reservoir Corporation Limited, Shangyu 312364, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2009-02-25

摘要: 分析了小舜江输水泵站一期电气设备改造的必要性,为确保绍兴方向不断水、保障工程质量,对改造方案的安全性、可行性进行了对比和分析。改造工程完成后,泵站运行状态良好,故障率明显减少。

关键词: 输水泵站, 电气设备, 改造

Abstract: The necessity of electrical equipment reformation in Xiaoshunjiang Water Transfer Pumping Station Project Phase I was analyzed. In order to ensure the water feeding to Shaoxing to be no interrupted and to ensure the construction quality of the project, the safety and fasibility of the reformation scheme were analyzed and compared. After reformation, the pumping station operated favorably, and the fault rate was reduced obviously.

Key words: water transfer pumping station, electrical quipment, reformation