浅议125MW机组循环冷却水系统的改造

黄伟   

  1. 江西省萍乡发电厂,江西萍乡 337016
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2009-02-25

Discussion on reform of circulating cooling water system in 125MW unit

HUANG Wei   

  1. Jiangxi Province Pingxiang Power Plant, Pingxiang 337016, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2009-02-25

摘要: 对江西省萍乡发电厂125MW机组循环冷却水系统存在着凝汽器真空值和热效率偏低的问题进行了分析,通过对循环冷却水系统的改造解决了这些问题,取得了良好的效果。

关键词: 凝汽器真空, 循环冷却水系统, 热效率, 改造

Abstract: The existed problems of the low condenser vacuum value and low thermal efficiency of 125MW unit in Pingxiang Power Plant were analyzed. The problems have been solved by reforming the circulating cooling water system, and the favorable results have been reached.