华电技术 ›› 2010, Vol. 32 ›› Issue (5): 4-5.

• 专题综述 • 上一篇    下一篇

300MW机组脱硫效率低的原因分析及解决方案

刘伟,高辉,张南   

  1. 辽宁华电铁岭发电有限公司,辽宁铁岭112000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2010-05-25

Reason analysis of lower desulphurization efficiency of 300MW unit and solving scheme

LIU Wei, GAO Hui, ZHANG Nan   

  1. Liaoning Huadian Tieling Power Generation Corporation Limited, Tieling 112000, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2010-05-25

摘要: 对辽宁华电铁岭发电有限公司 #3、#4机组脱硫效率低的问题进行了研究,分析了影响脱硫效率的因素并有针对性地采取了措施,机组脱硫效率明显提高。

关键词: 脱硫效率, 石灰石, 防腐, 鳞片

Abstract: The desulphurization efficiency of unit number 3 and unit number 4 of Liaoning Huadian Tieling Power Generation Corporation Limited was lower. The problem was researched, and the factors influencing on the desulphurization efficiency were analyzed. Some relevant measures were adopted, and the desulphurization efficiency of the unit was increased obviously. 

Key words: desulphurization efficiency, limestone, corrosion prevention, scale