泰可泽水电站200kN辐射式缆机安装技术

陆津发   

  1. 中国葛洲坝集团机电建设有限公司,湖北宜昌443002
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2010-07-25 发布日期:2010-07-25

Installation technology of 200kN radiationtype cable crane in Tekeze Hydropower Station

LU Jinfa   

  1. Mechanical and Electrical Consrtuction Corporation Limited of Gezhouba Group, Yichang 443002, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-07-25 Published:2010-07-25

摘要:

从现场施工角度出发,分析了泰可泽水电站辐射式缆机安装调试的施工方法和特点,介绍了安装过程中采取的具体技术措施。对安装场地的布置、主索安装及辐射式缆机系统调试等方案进行了详细的论述。

关键词: 辐射式缆机, 总体布置, 技术参数, 负荷试验, 缆机安装

Abstract: Starting from the angle of field constructing, the construction method and features of the radiationtype cable crane installation and commissioning in the Tekeze Hydropower Station were analyzed, and the concrete technical measures adopted in the installation process were introduced. The schemes of the arrangement of the installation field, the installation of the main cable and the radiationtype cable crane system commissioning were expounded in detail.

Key words: radiation-type cable crane, general arrangement, technical parameter, load test, cable crane installation