华电技术 ›› 2011, Vol. 33 ›› Issue (11): 69-73.

• 节能与环保 • 上一篇    下一篇

600MW机组湿法脱硫系统除雾器堵塞原因分析及对策

聂鹏飞,边东升,吴学民,张宏宇   

  1. 河北大唐国际王滩发电有限责任公司,河北唐山063611
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-11-25 发布日期:2011-11-25

Analysis on reasons of demister blockage of 600MW unit wet FGD systeme and countermeasures

NIE Pengfei, BIAN Dongsheng, WU Xuemin, ZHANG Hongyu   

  1. Hebei Datang International Wangtan Power Generation Company Limited, Tangshan 063611, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-11-25 Published:2011-11-25

摘要: 介绍了平板式除雾器的工作原理和结垢种类。针对河北大唐国际王滩发电有限责任公司2×600MW机组湿法烟气脱硫系统经常出现除雾器堵塞的问题,结合该电厂脱硫系统投产5年来的运行经验,对影响除雾器堵塞和结垢的2个主要因素进行了分析,提出了具体的应对措施。

关键词: 600MW机组, 湿法烟气脱硫, 除雾器, 堵塞, 结垢, 措施

Abstract: The working theory of the plate type demister and the category of its scaling were introduced. Aiming at the demister blockage fault, which often occurred in the wet FGD system of the 2×600MW unit of Hebei Datang International Wangtan Power Generation Company Limited, combining with the operation experience of the power plant FGD system obtained for 5 years since it was put into operation, the two main factors influencing on demister blockage and scaling were analyzed; and concrete countermeasures were put forward.