华电技术 ›› 2011, Vol. 33 ›› Issue (2): 66-69.

• 节能与环保 • 上一篇    下一篇

“四炉一塔”在半干法脱硫工程中的实现

邱刚,汲传军,马鸿良   

  1. 山东山大能源环境有限公司,山东济南250014
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-02-25 发布日期:2011-02-25

Realization of ‘four furnaces with one tower’ in semidry desulphurization project

QIU Gang, JI Chuanjun, MA Hongliang   

  1. Shandong Shanda Energy and Environment Company Limited, Jinan 250014, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-02-25 Published:2011-02-25

摘要: 介绍了双循环流化床半干法烟气脱硫工艺。在此基础上,结合双循环流化床烟气悬浮脱硫技术在“四炉一塔”烟气脱硫系统应用的实例,论述了在半干法烟气脱硫工程中应用的几项关键技术。

关键词: 双循环流化床, 半干法烟气脱硫, “四炉一塔”, 烟气流场

Abstract: The semidry flue gas desulphurization technology with dualcirculating fluidized bed boiler was introduced. Based on this, combining with the practical application example of flue gas suspension desulphurization technology with dualcirculating fluidized bed in the ‘four furnaces with one tower’ flue gas desulphurization system, several key technologies applied in semidry flue gas desulphurization project were expounded. 

Key words: dual-circulating fluidized bed, semi-dry flue gas desulphurization, ‘four furnaces with one tower’, flow field of flue gas