华电技术 ›› 2011, Vol. 33 ›› Issue (6): 40-41.
• 研究与开发 • 上一篇 下一篇
陈伟,王志浩,周庆科
收稿日期:
修回日期:
出版日期:
CHEN Wei, WANG Zhihao, ZHOU Qingke
Received:
Revised:
Published:
摘要: 对阿萨汉一级水电站并网变功率测振动试验进行研究,从上导+x/+y摆度等方面着手,论述了并网变功率测振动试验的几个测试步骤,重点分析了振动区和相关机组稳定运行的关系,可为其他海外工程提供借鉴和参考。
关键词: 水电站, 变功率测振动, 振动区, 摆度
Abstract: The vibration measurement experiment under synchronization condition with power changing of Asahan First Stage Hydropower Station was studied. Starting from the aspects of the +x/+y swing amplitudes of upper guide bearings and others, the measuring steps of the vibration measurement experiment under synchronization condition with power changing were expounded; and the relationship between the vibration zone and the operation stability of related unit was analyzed emphatically, which can provide some references for other oversea projects.
Key words: hydropower station, vibration measurement with power changing, vibration zone, swing amplitude
陈伟;王志浩;周庆科. 阿萨汉一级水电站并网变功率测振动试验分析[J]. 华电技术, 2011, 33(6): 40-41.
CHEN Wei;WANG Zhihao;ZHOU Qingke. Analysis on vibration measurement experiment under synchronization condition with power changing of Asahan First Stage Hydropower Station[J]. Huadian Technology, 2011, 33(6): 40-41.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.hdpower.net/CN/
https://www.hdpower.net/CN/Y2011/V33/I6/40