湖南镇水电站#5机组减振增容改造

余慧庆   

  1. 浙江华电乌溪江水力发电厂,浙江衢州324000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-08-25 发布日期:2011-08-25

Reformation of unit No.5 in Hunanzhen Hydropower Station for vibration attenuation and capacity expansion

YU Huiqing   

  1. Zhejiang Huadian Wuxijiang Hydropower Plant, Quzhou 324000, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-08-25 Published:2011-08-25

摘要: 介绍了湖南镇水电站 #5机组减振增容技术改造的原因,论述了 #5机组减振增容技术改造的实施情况。湖南镇水电站 #5机组改造后的试验和运行结果表明,湖南镇水电站 #5机组减振增容技术改造非常成功,机组的技术指标达到了增容改造的预期效果。

关键词: 水轮发电机组, 减振, 增容, 技术改造

Abstract: The reasons of reformation of unit No.5 in Hunanzhen Hydropower Station for vibration attenuation and capacity expansion were introduced. The implementation of the reformation for vibration attenuation and capacity expansion of unit No.5 was expounded. The test and operation results of reformed unit No.5 of Hunanzheng Hydropower Station show that the reformation is very successful; and the technical data of the unit were reached expected value of the capacity expansion reformation.

Key words: hydroelectric generating set, vibration attenuation, capacity expansion, technical reformation