华电技术 ›› 2012, Vol. 34 ›› Issue (1): 19-23.

• 研究与开发 • 上一篇    下一篇

基于双层增量动态规划法的机组实时优化分配系统

徐世元   

  1. 福建棉花滩水电开发有限公司,福建龙岩364000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-01-25 发布日期:2012-01-25

Optimized realtime unit load distribution system based on double layers increment dynamic planning method

XU Shiyuan   

  1. Fujian Mianhuatan Hydropower Development Company Limited, Longyan 364000, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-01-25 Published:2012-01-25

摘要: 介绍了基于双层增量动态规划法对福建棉花滩水电开发有限公司机组间负荷优化分配模型以及建立面向对象编程框架,开发出了高度可配置型的功能强大且使用方便的应用软件系统。该应用软件系统在发电调度中得到了实际应用,经济效益明显。

关键词: 机组负荷, 双层增量动态规划模型, 软件开发, 效益分析

Abstract: The optimized load distribution model between units of Fujian Mianhuatan Hydropower Development Company Limited, which is based on the double layers increment dynamic planning method, was introduced. An objectoriented programming frame was established. An application software system, which is highly configurable, powerful and easy to use, was developed. The application software system had been used practically in power generation dispatch, and obvious economic benefit was obtained.

Key words: unit load, double layers increment dynamic planning model, software development, benefit analysis