600MW机组分散控制系统功能完善

  

  1. (华电能源股份有限公司哈尔滨第三发电厂,哈尔滨〓150024)
  • 出版日期:2014-08-25 发布日期:2014-10-11

Function perfecting of distributed control system of 600MW unit

  1. (Harbin Third Power Plant of Huadian Energy Company Limited, Harbin 150024, China)
  • Online:2014-08-25 Published:2014-10-11

摘要: 摘要:华电能源股份有限公司哈尔滨第三发电厂600MW机组分散控制系统自投产以来出现了运行不稳定的问题,致使机组运行的稳定性大大降低,影响发电厂安全运行。结合机组运行的实际情况,对出现的故障逐一进行了分析,提出了解决方案,方案实施后,取得了良好的效果。

关键词: 关键词:分散控制系统, 主保护, 组态, 不稳定, 原因分析, 改进措施

Abstract: Abstract:In Harbin Third Power Plant of Huadian Energy Company Limited, after the distributed control system of the 600MW unit was put into operation, the system operation was unstable. So the unit stability lowered greatly, and the safe operation of the plant was affected. Combining with the actual situation of the unit operation, the occurred problems were analyzed one by one, and the solving scheme was proposed. After the scheme had been implemented, favorable results were obtained.

Key words: Keywords:distributed control system(DCS), main protection, configuration, instability, reason analysis, improvement measure