国内某核电站循环水系统调试工期优化方案研究

  

  1. 国核工程有限公司,上海〓200233
  • 出版日期:2018-07-25 发布日期:2018-08-24

Study on optimization scheme of circulating water in system commissioning period of a domestic nuclear power plant

  1. State Nuclear Engineering Company, Shanghai 200233,China
  • Online:2018-07-25 Published:2018-08-24

摘要:

国内某核电是世界首堆AP1000核电站,也是国内核电站首次使用叶片可调式结构的循环水泵。循环水系统是常规岛工艺系统调试的基础,其调试工期进度对其他系统调试的影响至关重要。针对该核电站循环水系统的特点,对系统调试工期进行优化,大大缩短了系统调试工期。

关键词:

Abstract:

A domestic nuclear power plant is the first AP1000 nuclear power plant in the world, and it is also the first domestic nuclear power plant using circulating pump with adjustable blade structure. The circulating water system is the debugging basis of the conventional island process system. Its debugging schedule is critical to other systems’ debugging. According to the characteristics of the circulating water system in the nuclear power plant, the commissioning period is optimized, which greatly shortens commissioning period of the system.

Key words: