华电技术 ›› 2010, Vol. 32 ›› Issue (9): 10-11.

• 专题综述 • 上一篇    下一篇

影响石灰石-石膏湿法烟气脱硫系统水平衡的运行因素

钟珊霞,章育铭,沈煜辉   

  1. 中国华电工程(集团)有限公司,北京100035
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2010-09-25 发布日期:2010-09-25

Operation factors affecting water balance of limestonegypsum wet flue gas desulphurization system

ZHONG Shanxia, ZHANG Yuming, SHEN Yuhui   

  1. China Huadian Engineering Corporation Limited, Beijing 100035, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-09-25 Published:2010-09-25

摘要: 对石灰石-石膏湿法烟气脱硫系统及其吸收塔在不同设计条件下进行了水平衡计算,分析了运行过程中水平衡的影响因素,为脱硫装置的运行管理提供参考。

关键词: 石灰石-石膏湿法烟气脱硫, 烟气换热器(GGH), 吸收塔, 水平衡

Abstract: The water balance of limestonegypsum wet flue gas desulphurization system and its absorption tower was calculated according to different design conditions. The affecting factors of water balance in operation process were analyzed, and a reference for operation and management of desulphurization installation was provided.

Key words: limestone-gypsum wet flue gas desulphurization, gas-gas heater (GGH), absorption tower, water balance