摘要: 电厂基建施工质量直接影响到机组投产后的安全稳定经济运行、节能环保和使用寿命。针对火电工程的施工特点,对土建、锅炉、汽轮机、电气、热控和焊接等专业的施工质量控制要点进行了论述和总结,希望能为火电厂建设提供参考。

关键词: 火电厂, 施工质量, 土建, 锅炉, 汽轮机, 电气, 热控, 焊接

Abstract: The power plant construction quality directly affects the safety, stability and operation economy of units,energy conservation, environment protection and the service life after the unit putting into operation. Aiming at the construction characteristics of thermal power projects, the key points for construction quality control about the civil engineering, boiler, steam turbine, electric, thermal control system and weld, etc. were expounded and summarized, expecting to give same reference for thermal power plant construction.

Key words: thermal power plant, construction quality, civil engineering, boiler, steam turbine, electric, thermal control system, weld