660MW机组超临界锅炉间全封闭受热面的吊装方法

王晓利,刘东民   

  1. 黑龙江省火电第三工程公司,黑龙江哈尔滨150016
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-03-25 发布日期:2012-03-25

Hoisting method of heating surface for 660MW supercritical boiler in whole closed boiler room

Hoisting method of heating surface for 660MW supercritical boiler in whole closed boiler room   

  1. Heilongjiang No.3 Thermal Power Construction Corporation, Harbin 150016, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-03-25 Published:2012-03-25

摘要: 分析了660MW机组超临界锅炉跨冬施工中存在的问题,以九台电厂 #1机组锅炉间全封闭条件下受热面的吊装方案为例,论述了锅炉在全封闭情况下受热面的吊装措施。

关键词: 660MW机组, 超临界锅炉, 全封闭受热面, 吊装措施, 问题分析

Abstract: The problems existing in winter construction of 660MW supercritical boiler were analyzed. Taking the heating surface hoisting scheme of the boiler No.1 in Jiutai Power Plant under the condition of whole closed boiler room as example, the boiler heating surface hoisting measures under the condition of whole closed boiler room were expounded.

Key words: 660MW unit, supercritical boiler, whole closed heating surface, hoisting measure, problem analysis