Hoisting method of heating surface for 660MW supercritical boiler in whole closed boiler room
Received:
Revised:
Published:
摘要: 分析了660MW机组超临界锅炉跨冬施工中存在的问题,以九台电厂 #1机组锅炉间全封闭条件下受热面的吊装方案为例,论述了锅炉在全封闭情况下受热面的吊装措施。
关键词: 660MW机组, 超临界锅炉, 全封闭受热面, 吊装措施, 问题分析
Abstract: The problems existing in winter construction of 660MW supercritical boiler were analyzed. Taking the heating surface hoisting scheme of the boiler No.1 in Jiutai Power Plant under the condition of whole closed boiler room as example, the boiler heating surface hoisting measures under the condition of whole closed boiler room were expounded.
Key words: 660MW unit, supercritical boiler, whole closed heating surface, hoisting measure, problem analysis
王晓利;刘东民. 660MW机组超临界锅炉间全封闭受热面的吊装方法[J]. 华电技术, 2012, 34(3): 41-44.
Hoisting method of heating surface for 0MW supercritical boiler in whole closed boiler room. Hoisting method of heating surface for 660MW supercritical boiler in whole closed boiler room[J]. Huadian Technology, 2012, 34(3): 41-44.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.hdpower.net/CN/
https://www.hdpower.net/CN/Y2012/V34/I3/41