摘要: 介绍了某电厂2×660MW新建机组超临界直流锅炉的设计特点及锅炉的调试情况,总结了锅炉调试过程中出现的问题,分析原因并提出了解决问题的方法,可为超临界直流锅炉的调试提供参考。
关键词: 超临界直流锅炉, 调试, 风机, 等离子
Abstract: The design features of the newbuilt 2×660MW supercritical oncethrough boiler of a power plant and the debugging situation of the boiler were introduced. The problems occurred in boiler debugging process were summarized; the reasons of the problems were analyzed, and the methods for solving these problems were proposed, which provides reference for debugging of supercritical oncethrough boiler.
Key words: supercritical once-through boiler, debugging, fan, plasma
陈辉;刘仕辉;黄启龙;王圣;李朝兵. 660MW机组超临界直流锅炉的调试[J]. 华电技术, 2012, 34(5): 1-3.
CHEN Hui;LIU Shihui;HUANG Qilong;WANG Sheng;LI Chaobing. Debugging of supercritical oncethrough boiler of 660MW unit[J]. Huadian Technology, 2012, 34(5): 1-3.