华电技术 ›› 2012, Vol. 34 ›› Issue (11): 60-62.

• 技术交流 • 上一篇    下一篇

智能变电站联调测试方法研究

董磊超,于士谦,乔彦涛,潘良煜   

  1. 许继电气股份有限公司,河南许昌461000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-11-25 发布日期:2012-11-25

Study on joint adjustment testing method of smart substation

DONG Leichao,YU Shiqian,QIAO Yantao,PAN Liangyu   

  1. XJ Electric Company Limited, Xuchang 461000, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-11-25 Published:2012-11-25

摘要: 论述了智能变电站联调的对象及联调项目,介绍了联调的核心配置文件——SCD文件的配置方法及注意事项。总结的联调经验及方法在许继电气股份有限公司智能变电站联调过程中得到了成功应用。

关键词: 虚端子, SCD文件配置, 联调, ICD文件检查, 检修

Abstract: The objects of the joint adjustment of smart substation and the items of the joint adjustment were expounded. The SCD file configuring method, which is the core configuration file of the joint adjustment, and the matters needing attention were introduced. The experiences and the methods of the joint adjustment summarized in this paper were applied successfully in the joint adjustment process of the smart substation by XJ Electric Company Limited.

Key words: virtual terminal, SCD file configuration, joint adjustment, ICD file inspection, overhaul