邹县发电厂335MW纯凝机组供热改造

王效柱1 ,李祥苓2,端木颜峰1,王树春2,赵新普2,姜受坤2,李曙光2   

  1. 1.华电国际邹县发电厂,山东邹城273522;2.华电漯河发电有限公司,河南 漯河462000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2012-12-25

Heatsupply reformation of 335MW straight condensing unit in Zouxian Power Plant

WANG Xiaozhu1,LI Xiangling2,DUANMU Yanfeng1,WANG Shuchun2,ZHAO Xinpu2,JIANG Shoukun2,LI Shuguang2   

  1. 1.Huadian International Zouxian Power Plant, Zoucheng 273522, China; 2.Huadian Luohe Power Generation Corporation Limited, Luohe 462000, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2012-12-25

摘要: 华电国际邹县发电厂2×335MW 纯凝机组为满足邹城市采暖需求进行了供热改造,供热抽汽从中压缸至低压缸导汽管上接出至热网首站,厂区内建设供热首站并通过厂区内新设的热网管道与邹城市热力管网连接。机组改造后取得了显著的社会效益和经济效益。

关键词: 335MW纯凝机组, 供热改造, 导气管, 热网首站, 热耗

Abstract: In order to satisfy the heating demands of the Zoucheng city, the 2×335MW straight condensing unit of Zouxian Power Plant was reformed into heat supplying unit. The steam extraction for heatsupply is led out from the steamguide tube between medium pressure cylinder and low pressure cylinder to the initial station of heat supply network. The initial station of heat supply network was built in plant area and connected with the heat supply piping network of Zoucheng city through the heat supply piping new built in plant area. After the reformation, favorable social effects and economical benefit were obtained.

Key words: 335MW straight condensing unit, heat-supply reformation, steam-guide tube, initial station of heat supply network, heat rate