火力发电厂原烟囱与临时烟囱的安全切换

孙普春,李宁   

  1. (华电国际邹县发电厂,山东邹城273522)
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2013-04-25

Safe switchover of original chimney and temporary chimney of thermal power plant

SUN Puchun, LI Ning   

  1. (Huadian International Zouxian Power Plant, Zoucheng 273522, China)
  • Received:1900-01-01 Revised:1900-01-01 Published:2013-04-25

摘要: 关键词:火力发电厂烟囱一旦严重腐蚀,机组、湿法烟气脱硫系统将无法正常运行,烟囱隔离检修期间需要加装临时烟囱过渡,原烟囱与临时烟囱的安全切换成为关注要点。介绍了华电国际邹县发电厂原烟囱和临时烟囱安全切换的重点技术环节,总结了切换过程中遇到的问题,供相关技术人员参考。

关键词: 脱硫系统, 原烟囱, 临时烟囱, 堵板, 安全切换

Abstract: hen the chimney of a thermal power plant is corroded seriously, the unit and the wet desulphurization system will can not operate normally. During isolated repairing of the original chimney, to install a temporary chimney is needed. The safe switchover of the original chimney and the temporary chimney becomes major concern. The key technical link in safe switchover of the original chimney and the temporary chimney of Huadian International Zouxian Power Plant was introduced, and the problems encountered in switchover process were summarized, which can be used as reference for relevant technicians.

Key words: desulphurization system, original chimney, temporary chimney, blocking board, safe switchover