摘要: 以2×350MW超临界燃煤供热机组为例,分析了采用凝抽背(NCB)装机方案的可行性、可靠性及经济性,采用该技术方案可大大提高机组的对外供热能力和经济性。
关键词: 燃煤供热机组, 凝抽背(NCB)技术, 装机方案, 经济分析
Abstract: Taking the 2×350MW supercritical coalfired heat supply unit as example, the feasibility, reliability and economical efficiency of the condensate extraction and backpressure (NCB) installation scheme were analyzed. To adopt the NCB technical scheme can improve the heat supplying capability and the economical efficiency of the unit significantly.
Key words: coal-fired heat supply unit, condensate extraction and backpressure (NCB) technology, installation scheme, economic analysis
郑立文. 350MW超临界燃煤供热机组凝抽背装机方案及经济性分析[J]. 华电技术, 2013, 35(5): 1-4.
ZHENG Liwen. NCB installation scheme for 350MW supercritical heat supply unit and economic analysis[J]. Huadian Technology, 2013, 35(5): 1-4.