华电技术 ›› 2013, Vol. 35 ›› Issue (10): 30-32.

• 研究与开发 • 上一篇    下一篇

电厂出线全停单机独立运行方案优化

  

  1. (内蒙古大唐国际托克托发电有限责任公司,内蒙古托克托〓010206)
  • 出版日期:2013-10-25 发布日期:2013-11-25

Optimization of independent operation scheme of single power unit after output lines all tripped

  1. (Inner Mongolia Datang International Togtoh Power Generation Company Limited, Togtoh 010206, China)
  • Online:2013-10-25 Published:2013-11-25

摘要: 摘要:以托电公司为例,介绍了500kV线路相继跳闸后 #8机组单机运行带全厂厂用电的情况。针对处理预案进行了分析,指出了方案存在的不足,并尝试进行了完善。

关键词: 关键词:线路跳闸, 出线全停, 单机运行, 方案, 优化

Abstract: Abstract:After the 500kV output lines of Togtoh Power Generation Company Limited tripped successively, the power unit No.8 operated alone and provided the auxiliary power of whole plant. The operation condition was introduced. The treatment plan for independent operation of the unit No.8 was analyzed, the shortcomings of the plan were pointed out, and the plan was perfected.

Key words: Key words:transmission line tripping, output lines all tripped, operation of single power unit, scheme, optimization