大唐陕西略阳发电厂技改工程179t发电机定子吊装

  

  1. (西北电力建设第三工程公司,陕西咸阳〓712021)
  • 出版日期:2014-06-25

Hoisting of 179t generator stator in technical innovation project of Datang Shaanxi Lueyang Power Plant

  1. (Northwest Power Construction Third Engineering Company, Xianyang 712021, China)
  • Published:2014-06-25

摘要: 摘要:为保证大唐陕西略阳发电厂技改工程179t发电机定子顺利吊装,通过对比确定了吊装方案。介绍了方案中采用的临时设施,分析了方案的难点及创新点,给出了强度校核结果,采取该方案安全、顺利完成了定子的吊装。

关键词: 关键词:发电机定子, 吊装, 创新

Abstract: Abstract:In the technical innovation project of Datang Shanxi Lueyang Power Plant, in order to ensure the 179t generator stator hoisting to be completed successfully, based on comparison, the hoisting scheme was determined. The temporary facilities adopted in the scheme were introduced. The difficulties and innovation points of the scheme were analyzed. The strength check result was given. The scheme was adopted, and the stator hoisting was completed safely and successfully.

Key words: Keywords:generator stator, hoisting, innovate