华电技术 ›› 2015, Vol. 37 ›› Issue (10): 15-16.

• 技术交流 • 上一篇    下一篇

再热蒸汽热段管道下沉原因分析及治理

  

  1. 华电电力科学研究院, 杭州 310000
  • 出版日期:2015-10-25

Analysis and governance of pipes sinking reason for reheat steam heat section

  1. Huadian Electric Power Research Institute,Hangzhou 310000,China
  • Published:2015-10-25

摘要:

摘要:某电厂再热蒸汽热段管道部分管段不断下沉,通过现场检查以及计算校核分析,确定管道实际质量超过理论设计值是管段下沉的主要原因,现场安装的恒力碟簧吊架性能异常也加剧了管道下沉势。根据各承重吊架的工作特点,通过采取更换恒力吊架、增加变力弹簧吊架输出载荷等方法,有效排除了管道下沉故障。

关键词: 关键词:再热蒸汽热段, 管道下沉, 壁厚, 恒力碟簧吊架

Abstract:

Abstract:A certain power plant found that a part of the reheat steam heat section of pipeline keep sinking.Site investigation and calculating check and analysis confirms that the main reason causing sinking pipes is that the actual mass of pipes exceeds design value.Meanwhile, property abnormality of constant support disc spring hangers at the site aggravate pipes sinking tendency. According to working characteristics of each bearing hangers,taking measures as replace constant hangers and increase output load of variable spring support and hanger can be effective solution of pipes sinking.

Key words: ">Keywords:">reheat steam heat section">;">pipessinking">;">wall thickness">;">constant support disc spring hangers