糯扎渡水电厂大型机组顶盖取水试验

  

  1. 华能澜沧江水电股份有限公司糯扎渡水电厂,云南普洱〓665005
  • 出版日期:2016-11-25

Nuozhadu Hydropower Plant utility type unit top cover water sample experiment

  1. Huaneng Lancangjiang Hydropower Company Limited Nuozhadu Hydropower Plant,Puer 665005, China
  • Published:2016-11-25

摘要:

摘要:以华能澜沧江水电股份有限公司糯扎渡水电厂为例,介绍了大型水电机组顶盖取水试验的措施和方法,在试验过程中解决了一些难题,使试验取得了成功,可为同类机组开展相关试验提供参考。

关键词:

Abstract:

Abstract:Take Huaneng Lancangjiang Hydropower Company Limited Nuozhadu Hydropower Plant as an example, the method to take water sample from hydropower plant utilitytype unit top cover was indicated. Difficulties during experiment was overcome. Which could be referred by similar experiment.