Huadian Technology ›› 2011, Vol. 33 ›› Issue (7): 4-6.
• 专题综述 • Previous Articles Next Articles
LIU Demei, ZHANG Qingguo, LIU Yuanzhen
Received:
Revised:
Published:
Abstract: The preparatory work before overhaul, the standardized work during overhaul and the tidying work after overhaul for largecapacity steam turbine were introduced, which can cause the technicians to understand the entire process of steam turbine overhaul clearly. This is helpful to ensure the seamless connection in the overhaul process, to enhance the overhaul quality of the steam turbine and to shorten repairing time; and it is useful for safe and stable operation of the unit in longer period.
Key words: steam turbine, overhaul, delicacy management
LIU Demei;ZHANG Qingguo;LIU Yuanzhen. Delicacy management of largecapacity steam turbine overhaul[J]. Huadian Technology, 2011, 33(7): 4-6.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I7/4
Energysaving transformation of vacuum pump in 660MW steam turbine generator set
Analysis and treatment of abnormal vibration of a steam turbine of 600MW unit