Huadian Technology ›› 2009, Vol. 31 ›› Issue (9): 6-9.
• 专题综述 • Previous Articles Next Articles
WU Kai
Received:
Revised:
Published:
Abstract: As the GIS overhaul progressed and the upcoming retrofit of protection device for generatortransformer unit in Dongfeng Power Plant, it is more important to synchronously implement the duple configuration of breaker operating circuit and the application of related circuits at the foundation of achieving duple configuration of main equipments. The main problems existing in 220kV breaker operating circuit of Dongfeng Power Plant, such as DC operating power supply, tripping prevention, etc., were researched, the retrofit scheme of 220kV breaker operating circuit has been investigated, and the substantial suggestions were proposed in this paper.
Key words: 220kV breaker, duple, DC operating circuit
WU Kai. Investigation on retrofit scheme for 220kV breaker operating circuit in a certain power plant[J]. Huadian Technology, 2009, 31(9): 6-9.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2009/V31/I9/6