Huadian Technology ›› 2012, Vol. 34 ›› Issue (11): 34-36.
• 技术交流 • Previous Articles Next Articles
WANG Xiaolong,CHEN Yiyang
Received:
Revised:
Published:
Abstract: The structure features and the technical principle of the new plasma ignition system were introduced. According to the application of the system in the 1000MW ultra supercritical boiler of Guangdong Yudean Jinghai Power Generation Company Limited, the problems occurred in commissioning were analyzed. By the continual readjustment in practical operation, the operation parameter optimization scheme of the plasma ignition system was summarized. Thus, the arc interrupting phenomenon of the boiler plasma ignition system had been controlled effectively; and the safety of the boiler in start up, shutdown and normal operation was improved.
Key words: 1000MW ultra supercritical boiler, plasma ignition, operation optimization
WANG Xiaolong;CHEN Yiyang. Operation optimization of new plasma ignition system of 1000MW ultra supercritical boiler[J]. Huadian Technology, 2012, 34(11): 34-36.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2012/V34/I11/34
Operation optimization an SCR denitration system in a coalfired power plant
Application of plasma ignition device in lowvolatiles coalfired boiler