Huadian Technology ›› 2014, Vol. 36 ›› Issue (5): 1-2.

    Next Articles

Discussion of difficulties and solutions way when low load operation in the distributed energy station

  

  1. (1.Huadian Distributed Energy Engineering & Technology Corporation Limited, Beijing 100160,China; 2.Huadian Engineering Design Institute, Beijing 100160,China)
  • Online:2014-05-25 Published:2014-07-15

Abstract: Abstract:Low load operation is a common problem, as an example of affected many large scale building like distributed energy stations. With the distributed energy station in Huadian Industrial Park chosen as a typical case were analyzed, we studied the causes and potential impacts of low load operation, and then proposed resolution plan form the aspects of main machine selection, system designing, operation and management etc., serving as a reference for similar projects.