Huadian Technology ›› 2015, Vol. 37 ›› Issue (4): 16-18.
Previous Articles Next Articles
Published:
Abstract: Abstract:According to the local raining condition and the port position features of the Cambodia Sihanouk Power Plant, aiming at the problems existed in original drainage system of the coal yard and the ash yard, a new overflowtype drainage scheme was proposed. The analysis shows that the overflowtype drainage scheme can meet the drainage requirement. Meanwhile, the scheme can reduce the cost by about 3.34 million yuan.
Key words: Keywords:coal yard, ash yard, ash dam, drainage, overflowtype drainage
JIANG Fangshuai, LI Nan. Optimal design of drainage system of coal yard and ash yard for power plant located in highrainfall port[J]. Huadian Technology, 2015, 37(4): 16-18.