Huadian Technology ›› 2015, Vol. 37 ›› Issue (5): 48-49.
Previous Articles Next Articles
Guangdong Yudean Jinghai Power Generation Company Limited, Jieyang 515223, China
Published:
Abstract:
Abstract:In commissioning process of unit No. 4 of Guangdong Yudean Jinghai Power Generation Company Limited, it was found that under high unit load,the vibration of the shafts No. 1 and No. 2 suddenly increased. Considering related vibration parameters, it confirmed that steam flowexcited vibration occurred.In the original valve control logic of the steam turbine DEH system, the main control valve CV4 and the last control valve CV1 were exchanged, so the inlet steam distribution of upper and lower parts of the turbine cylinder was changedand the steam flowexcited vibration was restrained. After adjustment,the vibration of shafts No. 1 and No. 2 is about 40 μm during normal operation, and favorable result was obtained.
Key words: font-family: E-HZ-PK74810c, color: black">Keywordsfont-family: SSJ-PK74820000002, color: black">: font-family: E-BZ-PK748e5, color: black">ultra supercritical unitfont-family: SSJ-PK74820000002, color: black">, font-family: E-BZ-PK748e5, color: black">steam turbinefont-family: SSJ-PK74820000002, color: black">, font-family: E-BZ-PK748e5, color: black">steam flowfont-family: E-BZ-PK748e5, color: black">excited vibrationfont-family: SSJ-PK74820000002, color: black">, font-family: E-BZ-PK748e5, color: black">control valve
font-family: E-HZ-PK74810c,
GUO Jie, QIN Xichao. Analysis on steam flowexcited vibration of steam turbine of an 1 000 MW ultra supercritical unit and treatment[J]. Huadian Technology, 2015, 37(5): 48-49.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2015/V37/I5/48
Analysis on improvement of pressure water injection design for circulating water system of a nuclear power plant
Analysis on reasons of lower limit action of fuelfeed water crosing restriction of an ultra supercritical unit and treatment
Analysis on reasons of leakage defect of positivepressure directfired system and treatment measures
Analysis on reason of fracture of valve stem of turbine HP main valve and repair
Analysis on application of new steam seal clearance measurement technology for steam turbine
Analysis on reasons of ash blockage of boiler air preheater and treatment measure
Simulation research on electrohydraulic synchronous control system of tumble gate in ship lift gate bay of Silin