模态框(Modal)标题

在这里添加一些文本

模态框(Modal)标题

RSS
  • Home
  • About Journal
  • Editorial Board
    • Editorial Board
  • Publication Ethics
  • Journal Online
    • Just Accepted
    • Current Issue
    • Archive
    • Most Read Articles
    • Most Downloaded Articles
    • Most Cited Articles
  • Subscription
  • Advertisement
  • Contact Us
  • 中文
Abstract:To guarantee the stability and operation safety of power grid,on load test of new equipment shall be carried out before put into operation.After test on capacitor,electric reactor,cable and transformer,angle of attack charter of voltage,current and load flow value was drafted.After analyzing test results,the causes of change of current,voltage and phase was indicated.
HE Liping1,LI Chunliang1,HUANG Zuwei1,CAI Zhaoyu1,ZHOU Zhiqin2,YIN Hao2
Huadian Technology . 2016, (2): 55 -58 . 

豫ICP备19039093号
Website Copyright © Editorial Department of Integrated Intelligent Energy
Tel: 0371-58501042 Fax: 0371-58501055 E-mail: hdjs-chd@vip.163.com
Powered by Beijing Magtech Co., Ltd.
Total visitors: Visitors of today: Now online: