Loading...

Table of Content

    25 February 2015, Volume 37 Issue 2
    Method to propel progress of energy efficiency of China
    DENG Jianling
    2015, 37(2):  1-3. 
    Asbtract ( 287 )  
    Related Articles | Metrics
    Abstract:The energy structure features of China were analyzed. Starting from the angles of improving the energy efficiency, reducing the pollutant emission and protecting the environment, under the premise of ensuring economy development and reducing pollutant emission, an idea of “end treatment of stock assets and beforehand control of new increment assets” was put forward. It was suggested to establish the energy efficiency examination mechanism with indexes of region GDP value per kW•h electric energy consumption and energy consumption per 10000 yuan GDP. In addition, the utilization of the renewable energy must be increased. Above measures can propel progress of energy efficiency of China.
    Study on description method of secondary virtual circuit object information model for smart substation
    JI Ling1, LI Zhongming1, JIANG Yanjun1, QIU Yutao2, QIU Qunhui3, JIANG Weijian3
    2015, 37(2):  4-8. 
    Asbtract ( 318 )  
    Related Articles | Metrics
    Abstract:The composition of secondary virtual circuit of smart substation was introduced. Referring to the description method of primary topology of the substation, the virtual secondary circuit objects of the secondary equipments and their circuit connection relations were expounded. A set of description methods of secondary virtual circuit object information model for smart substation was established, which provides model foundation for the visual state monitoring and the realization of various advanced application functions of the secondary virtual circuit of the smart substation.
    Research on phosphating technology for pipes of rotating electric machines in nuclear power station
    LI Ge
    2015, 37(2):  9-12. 
    Asbtract ( 230 )  
    Related Articles | Metrics
    Abstract:According to the rust prevention requirement of the pipes of rotating electric machines in nuclear power stations, a detailed phosphating technology process was developed.The problems occurred in implement of the technology process, such as the overetching, the unevenness of phosphating film and the rerust after phosphorization, were researched experimentally, and the optimal proportion of the acid washing liquid and the best phosphorization agent were obtained. The problem of rerust after phosphorization was solved. The results in this paper provide reference for phosphating of similar equipments in nuclear power stations.
    Use of fuzzy linear weighting method to solve economic dispatch problem of power system
    GUO Zixue, ZHENG Yumeng, WANG Shichao
    2015, 37(2):  13-15. 
    Asbtract ( 248 )  
    Related Articles | Metrics
    Abstract:The power system economic dispatch is multiobjective, and in practice, the importance of each objective function is different. Aiming at above situation, a fuzzy linear weighting method for solving economic dispatch problem of power system was proposed. In this method, the linear weighting method is used in the membership functions of each objective function to solve the economic dispatch problems of power system, and the Lingo software is used in example simulation. The solutions of the fuzzy linear weighting method and the minimax method were compared, and the comparison results show that the fuzzy linear weighting method is more suitable for practical problems.
    Research on import and export method of virtual terminal information of smart substation
    ZHENG Wenbin1, WANG Ruibiao2
    2015, 37(2):  16-20. 
    Asbtract ( 260 )  
    Related Articles | Metrics
    Abstract:A method to import and export the virtual terminal information used in commissioning and reconstruction of smart substation was introduced. The first step is to write the virtual terminal information into a fixedfield format file. Sequently, the virtual terminal information can be imported by oneclicked operation. Then the virtual terminal configuration of whole substation is accomplished. After this, the virtual terminal information file can be exported by oneclicked operation. Using the file, it is convenient to rewrite the virtual terminal connection relation in smart substation reconstruction and to backup the virtual terminal connection relation. The engineering practice shows that using the function, the workload of virtual terminal configuration of a smart substation was reduced considerably.
    Study on model of influence of coal sulfer content on economic efficiency of boiler and desulphurization system
    HOU Dean, JIANG Pengbo
    2015, 37(2):  21-23. 
    Asbtract ( 342 )  
    Related Articles | Metrics
    Abstract:The experimental research of coal sulfur content variation for the lean coalfired units and bituminous coalfired units was carried out while the emission of the desulphurization system was ensured to meet related standard. The influence of the variation of coal sulfur content on the hightemperature corrosion of the boiler system and the operating cost of the desulphurization system were analyzed comprehensively. The influence of coal sulfur content on the economic efficiency of the coalfired boiler and the desulphurization system was grasped. The results in this paper provide reference for enterprises to improve the environmental protection level and the economic benefit of power units.
    Highhardness RO concentrated water treatment technology
    WANG Chun1, WANG Ping2
    2015, 37(2):  24-26. 
    Asbtract ( 418 )  
    Related Articles | Metrics
    Abstract:Several technologies, such as the dosing reaction sedimentation, the magnetic water circulating cross flow and the microfiltration, were combined adopted to treat the reverse osmosis concentrated water. The product water indexes are as below: hardness (expressed as CaCO3) ≤300mg/L, turbidity <5NTU, which meet the requirements of file GB/T 19923—2005 “The Reuse of Urban Recycling Water:Water Quality Standard for Industrial Uses”. The burden of the sequent reuse treatment unit was lightened, and the water utilization rate was improved.
    Application of ABB REA Arc Protection System in medium and low voltage switchgear and busbar
    ZHENG Jianfei
    2015, 37(2):  27-29. 
    Asbtract ( 337 )  
    Related Articles | Metrics
    Abstract:The hazard of electric arc inside the medium and low voltage switchgear was introduced. The features of ABB REA arc protection system were expounded. Taking an 110kV substation as example, the application results of various protection schemes were analyzed and compared, and the conclusion is that the arc protection is the optimal protection scheme.
    Reformation of incoming air filtration system of 9Etype gas turbine
    WANG Shuguo1, SUN Jian2, HOU Li3, ZENG Rongpeng3
    2015, 37(2):  30-33. 
    Asbtract ( 391 )  
    Related Articles | Metrics
    Abstract:The problems, which occurred in operation of incoming air filtration system of 9Etype gas turbine of Inner Mongolia Sulige Gas Power Generation Company Limited, were introduced. The reformation scheme was proposed. Based on comparison of operation parameters and reformation effect, the influence of incoming air pressure loss of the gas turbine on the unit performance was analyzed. After the reformation, the service lives of the filter element and the compressor blade were lengthened. The maintenance cost was reduced, and the unit performance was improved obviously.
    Application of light intelligent towerclimbing equipment in UHV transmission tower of AnhuitoShanghai power transmission line
    WANG Zhijun, LI Xuebin, YANG Junning, FU Ran, ZHOU Limin
    2015, 37(2):  34-35. 
    Asbtract ( 389 )  
    Related Articles | Metrics
    Abstract:The light intelligent towerclimbing equipment, as manriding climbing equipment, is mainly used for climbing UHV/EHV transmission towers. The equipment consists of towerclimbing device and guide rail. Depending on the UHV transmission tower of AnhuitoShanghai 1000kV power transmission line, a holistic solution of operation, maintaining and repairing of the light intelligent towerclimbing equipment used in UHV tower was presented. The equipments were installed and used in four towers, and the using effects were favorable. The labor intensity of the workers was reduced, and the work efficiency was improved.
    Analysis on reasons of meshing ahead of time of turning gear and treatment measures
    ZHANG Jun
    2015, 37(2):  36-38. 
    Asbtract ( 324 )  
    Related Articles | Metrics
    Abstract:The turning gear of a unit meshed automatically without instruction signal. Aiming at above fault, the structure and the working principle of the turning gear were analyzed. The mechanical features and the control method of the turning gear were analyzed, and the fault reasons were found. The treatment measures were proposed.
    Analysis on anticoking features of east Junggar coalfired boiler
    LI Peng, ZENG Qi, ZHANG Dade, YU Liyang, WANG Zhenping
    2015, 37(2):  39-41. 
    Asbtract ( 391 )  
    Related Articles | Metrics
    Abstract:The coking characteristics of east Junggar coal were introduced. The main design parameters of east Junggar coalfired boiler were expounded. The technical features of east Junggar coalfired boiler were analyzed. The ideas about the furnace size optimization, the soot blower arrangement,the type selection of the burner and the slag conveyer and the supervision points of the furnace outlet temperature were clarified. The technical reformation measures were proposed.
    Analysis and processing on fault reason of pneumatic brake system of hydropower unit No.1 in Huanglongtan Hydropower Plant
    PENG Jun
    2015, 37(2):  42-43. 
    Asbtract ( 245 )  
    Related Articles | Metrics
    Abstract:In Hydropower unit No.1 of Huanglongtan Hydropower Plant of State Grid Hubei Electric Power Company, the pneumatic brake can not stop the water turbine successfully in automatic mode.The defect was analyzed,and relevant measures were adopted. The defect was eliminated. The result in this paper can be used as reference for similar hydropower plants.
    Experimental research on combustion adjustment of 600MW unit
    FU Yongqiang1, LI Kui1, CHEN Naixiao1, HE Jinbo1, CHENG Qiang2, YAO Bin2
    2015, 37(2):  44-47. 
    Asbtract ( 299 )  
    Related Articles | Metrics
    Abstract:Through the adjustment experiment of the coal mill system, the relationship of the coal fineness and the energy consumption of the mills with the opening degree of the splitter, the loading force, the output and the air volume was investigated. The operation parameters of the mills were optimized. The equilibrium of the coal-air ratio of the mills and the pulverized coal fineness were improved. The experiments of changing primary air flow, changing oxygen, changing secondary air and tertiary air and changing the burner air distribution mode were carried out, and according to the experiment results, the influence of the boiler operation parameters on the boiler efficiency were studied. Based on above experiments results, the operation parameters of the unit were optimized and adjusted. The problems of the unit in its operation, which include high combustible matter content in fly ash and the high exhaust gas temperature, were solved. The safe and stable operation of the unit was ensured.
    Analysis on startup fault of butterfly valve oil pump of hydropower station and treatment
    LI Jianshan1, LI Lihua2,LI Huabing3
    2015, 37(2):  48-49. 
    Asbtract ( 280 )  
    Related Articles | Metrics
    Abstract:When the butterfly valve was opened fully, the oil pressure had reduced to oilsupplement position, but the oil pump did not start up normally. Aiming at above fault,the fault was analyzed.Close the butterfly valve and reopening at the shutdown state, make the order of butterfly valve open and pressure maintaining action and self maintenance, the fault is removed.
    Problems existing in application of automatic bus transfer equipment in 110kV input line and improvement measures
    MA Yuling, LIAO Hongtao
    2015, 37(2):  50-51. 
    Asbtract ( 265 )  
    Related Articles | Metrics
    Abstract:The automatic bus transfer equipment for 110kV input line is almost used in terminal load substations. The bus differential protection is not configured in these substations. The bus faults are permanent faults commonly. Under this condition, the automatic bus transfer equipment did not be locked out and acted to switch the standby power on the failed bus, which caused impact on the transformer repeatedly. Taking the automatic bus transfer equipment for single bus segmentation input line as example, it was proposed to investigate the input side line current and to judge the bus fault according to the variation of the input line current, and the judge result can be used as decision condition to lock out the automatic bus transfer equipment.
    Analysis on application of highspeed variable frequency soot blowing technology in power pant
    XU Qing
    2015, 37(2):  52-53. 
    Asbtract ( 284 )  
    Related Articles | Metrics
    Abstract:The highspeed variable frequency soot blowing technology is widely used in domestic coalfired power plants, and favorable effects in eliminating the flue blockage by fly ash and improving heat transfer efficiency of heating surface were obtained. The working principle of the highspeed variable frequency soot blower was introduced. The install positions were analyzed, and some concrete suggestions were given. In order to improve the device effect, the development direction of the device in future was imagined.
    Analysis on measurement error of online chemical instruments of water steam system and improvement methods
    ZHENG Rigui
    2015, 37(2):  54-56. 
    Asbtract ( 290 )  
    Related Articles | Metrics
    Abstract:The situation of measurement error of the online chemical instruments of unit No.1 water steam system in a power plant was introduced. The reasons of the measurement error were analyzed. The improvement methods to reduce measurement error were proposed. After the methods were adopted, the measurement accuracy of the online chemical instruments of the power plant was improved, and the reliability of the water steam chemical supervision was ensured.
    Analysis on reasons of stall of primary air fan and preventive measures
    YIN Bingyi, NIU Shusen, SHEN Henan
    2015, 37(2):  57-58. 
    Asbtract ( 464 )  
    Related Articles | Metrics
    Abstract:In a power generation company, the boiler MFT accident occurred caused by stall fault of the primary air fan. The reasons of the stall fault of the primary air fan were analyzed. The preventive measures were proposed. The RB protection logic of the primary air fan was perfected. The runback protection logic of low primary air pressure was added, and the MFT accident due to stall fault of primary air fan can be avoided. So the safe operation of the unit was ensured.
    Analysis on reasons of lower lubricating oil pressure of 1000MW steam turbine and treatment
    WANG Haibo
    2015, 37(2):  59-60. 
    Asbtract ( 474 )  
    Related Articles | Metrics
    Abstract:In startup process of the 1000MW unit of a power plant, when the rotate speed of the turbine increased to 3000r/min, the lubricating oil pressure became lower, and the currents of the AC lubricating oil pump and the startup oil pump became larger. The unit was shut down for inspection. It was found by inspection inside the lubricating oil box that the plug of the inlet pipe of the oil turbine booster pump from the main oil pump outlet fell out, which caused the output of the oil turbine booster pump of the lubricating oil system to be insufficient. The plug was reinstalled and fixed, and the fault was eliminated.
    Prevention of leakage of boiler heating surface tube and measures of fine maintenance management for boiler heating surface
    CHEN Zhibo1,JING Hua1, WANG Jiaan2, LI Liang1, SHI Yan2, ZHANG Jinwen2
    2015, 37(2):  61-62. 
    Asbtract ( 350 )  
    Related Articles | Metrics
    Abstract:The leakage of boiler heating surface tubes in thermal power plant is important factor to cause unplanned shutdown of the power unit, which may bring large losses for power enterprises in economic benefit and social effect. To reduce the leakage fault frequency of the boiler heating surface tubes effectively and to improve health level of the boiler heating surface is becoming one of most concerned problems for every power enterprise. In order to prevent leakage of the boiler heating surface tubes and to enhance the fine maintenance management of the boiler heating surface, the fine managements in “inspection”, “repair” and “persons” were analyzed and summarized, and detailed prevention and control measures were proposed.
    Application of denitration system reformation technology in 300MW unit
    TANG Chao, ZHAO Hongcheng
    2015, 37(2):  63-64. 
    Asbtract ( 360 )  
    Related Articles | Metrics
    Abstract:The equipments of the 300MW unit of Jiangsu Huaiyin Power Generation Company Limited. were introduced. Aiming at the practical situation of the equipments and the field of the company, the features of the denitration technology were analyzed. Based on this, the denitration project reformation was implemented. The layout of the inlet and outlet flues of the reactor, the distribution of flow field of the denitration devices and the steel structure were optimized; and better result was obtained.
    Analysis and optimization of denitration control system of thermal power plant
    NI Xinyu
    2015, 37(2):  65-67. 
    Asbtract ( 351 )  
    Related Articles | Metrics
    Abstract:The principle and the technological process of selective catalytic reduction (SCR) method denitration were introduced. The processing principle of measured data of denitration system was expounded. Aiming at the shortcoming of original control logic, the control logic was optimized. The optimized control strategy can both control NOx removal and control the ammonia escape, and the control quality was improved obviously.
    Application example of HW clarifying technology in reclaimed water reuse field of power plant
    LUO Debo1, YAN Caixia1, CUI Weiqiang2, HUI Zhaohua1
    2015, 37(2):  68-72. 
    Asbtract ( 335 )  
    Related Articles | Metrics
    Abstract:The general situation of reclaimed water reuse in Huaneng Beijing Cogeneration Corporation Limited was introduced. Considering the limit of site area, the lower input water turbidity and the smaller reserved capacity of the support equipments, the HW clarifying tank was selected to replace the circular clarifying tank. The technological process of the project and the main design parameters of each processing unit were expounded. After the HW clarifying technology was adopted, when the input water flow reaches to the design flow, the turbidity of the output water of the HW clarifying tank is between 0.4NTU and 0.9NTU, which meets the requirement of the design standard.
    Application of movable pole plate in reformation of electrostatic precipitator of thermal power plant
    ZHANG Ronglu
    2015, 37(2):  73-75. 
    Asbtract ( 366 )  
    Related Articles | Metrics
    Abstract:In order to improve efficiency of the electrostatic precipitator and to ensure flue gas dust emission to meet the standard requirement, the electrostatic precipitator was reformed. The working principle and the features of the electrostatic precipitator with movable pole plate were expounded. The reformation content of the electrostatic precipitator with movable pole plate of unit No.10 in a power plant was introduced. After the reformation, the dust emission mass concentration in outlet of the desulphurization tower is 24.66mg/m3, amended to 6% oxygen, the emission mass concentration is 23.86mg/m3, which is lower than 30mg/m3, the standard upper limit. The expectant target of the reformation was realized.