华电技术 ›› 2008, Vol. 30 ›› Issue (6): 52-56.

• 一线动态 • 上一篇    下一篇

石灰石-石膏湿法烟气脱硫装置的运行分析

支国庆,杨邺   

  1. 北方联合电力临河热电厂,内蒙古 巴彦淖尔 015000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2008-06-25 发布日期:2008-06-25

Analysis on Operation of Limestone-gypsum WFGD Equipments

ZHI Guoqing, YANG Ye   

  1. North United Power Linhe Thermal Power Plant, Bayannaoer 015000, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2008-06-25 Published:2008-06-25

摘要: 详细介绍了300MW机组石灰石-石膏湿法烟气脱硫装置的运行情况,对存在的技术问题进行了原因分析,并提出解决方法。对目前烟气脱硫装置的运行维护工作及管理体制提出了意见与建议。

关键词: 湿法烟气脱硫(WFGD), 运行分析, 运行维护, 管理体制

Abstract: The operation status of limestone-gypsum wet flue gas desulfurization equipments of 300MW unit was introduced in detail. The existent problems were analyzed, and the solving methods were proposed. Some suggests about operation and maintenance of current flue gas desulfurization equipments and their management system were put forward.

Key words: wet flue gas desulfurization (WFGD), operating analysis, operation and maintenance, management system