2×600MW奥里油发电厂锅炉主要问题分析及解决

宋景慧,刘庆鑫   

  1. 广东电网公司电力科学研究院,广东广州 510600
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2009-12-25 发布日期:2009-12-25

Analysis and solution of the main problems of boiler in 2×600MW orimulsion oil power plant

SONG Jinghui, LIU Qingxin   

  1. Guangdong Power Test and Research Institute, Guangdong Gride Company ,Guangzhou 510600, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-12-25 Published:2009-12-25

摘要: 湛江奥里油发电厂2×600MW锅炉国内首座专门为燃烧奥里油设计生产的锅炉,对该电厂锅炉带不到设计负荷、输灰系统不畅、空气预热器堵塞的原因进行了分析,对解决这些问题的方法进行了探讨,给出了解决这些问题的方法。

关键词: 奥里油, 锅炉, 输灰系统, 空气预热器

Abstract: The 2×600MW boiler of Zhanjiang Orimulsion Power Plant is the first boiler specially designed for burning orimulsion oil. Some problems existed in the plant, such as that the boiler can not get designed load, the ash conveying system was blocked, the air preheater was blocked and others. The reasons of these problems were analyzed, and, by research, the methods solving these problems were given.

Key words: orimulsion, boiler, ash conveying system, air preheater