循环流化床锅炉一次风机“抢风”问题的分析

赵晓东,张乐群   

  1. 广东粤电油页岩发电有限公司,广东茂名525000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2009-02-25

Analysis of the "blower pinch" of the primary air fan in CFB boiler

ZHAO Xiaodong,ZHANG Lequn   

  1. Guangdong Yudean Oil Shale Power Generation Corporation Limited, Maoming 525000, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2009-02-25

摘要: 通过变频技术对风机进行改造已经逐渐成为提高发电厂效率的一种方式,但由于变频改造而出现的风机“抢风”问题对发电厂的安全运行造成了严重威胁。 通过对某电厂一次风机变频改造后“抢风”现象进行分析, 提出了可行的解决方案。

关键词: 循环流化床, 一次风机, 离心风机, 变频, 抢风

Abstract: The technical reformation of fans by using the frequency converter is gradually becoming the popular way to increase the efficiency of the power plant. However, the problem of "blower pinch" was happened sometimes due to application of the frequency converter, which causes a great threat to the safety operation of the power plant. The "blower pinch" phenomenon occurred in a power plant after the frequency conversion reformation was analyzed, and feasible solving measures were proposed.

Key words: circulating fluidized bed, primary air fan, centrifugal fan, frequency conversion, blower pinch