火电厂石灰石-石膏湿法烟气脱硫废水排放量的计算

吴冲,陶爱平   

  1. 中国华电工程(集团)有限公司,北京100035
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2010-09-25 发布日期:2010-09-25

Computation of wastewater discharge of limestonegypsum wet FGD system in thermal power plant

WU Chong, TAO Aiping   

  1. China Huadian Engineering Corporation Limited, Beijing 100035, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-09-25 Published:2010-09-25

摘要: 分析了脱硫废水产生的原因,介绍了脱硫废水排放量计算的3个基本计算模型,举实例对3个计算模型的应用情况进行了阐述并对计算结果进行了分析。

关键词: 湿法脱硫, 脱硫废水, 废水排量, 计算模型

Abstract: The reason of desulphurization wastewater generation was analyzed. Three basic computation models for desulphurization waste water discharge computing were introduced. The application of these three computation models was illustrated by examples, and the computation results were analyzed. 

Key words: wet FGD, desulphurization waste water, waste water discharge, computational model