国产135MW循环流化床锅炉试运行经验

王海波,项礼刚   

  1. 郑东新区热电厂,河南郑州450000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-01-25 发布日期:2011-01-25

Experience of commissioning of 135MW domestic circulating fluidized bed boiler

WANG Haibo, XIANG Ligang   

  1. Zhengdong New District Thermal Power Plant, Zhengzhou 450000, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-01-25 Published:2011-01-25

摘要: 介绍了河南义马矸石电厂DG440/13.7-II2型135MW循环流化床锅炉的基本状况,论述了冷态试验及锅炉点火升压、运行的过程,总结了调试中出现的问题并提出了解决方法。经燃烧优化试验调整后,锅炉连续运行能力和可靠性得到提高,可为同类型机组运行提供借鉴。

关键词: 135MW循环流化床锅炉, 冷态试验, 试运行

Abstract: The basic situation of DG440/13.7-II2 type 135MW circulating fluidized bed boiler in Henan Yima Ganguefired Power Plant was introduced. The processes of the cold functional test, the ignition pressurization and operation were expounded. The problems occurred in debugging were summarized, and the solving methods were put forward. After the adjustment based on combustion optimization test, the continuous operation ability and the reliability of the boiler had been raised. The experience can provide reference for similar units.