摘要: 在水电工程引水隧洞或其他地下洞室工程施工中,经常出现塌方、溶洞、高压涌水和大断层等不良地质洞段,给施工安全带来极大隐患。通常采用地质钻孔来探明前方地质情况,探测距离很短且耗时长。采用TSP203 超前地质预报系统能有效地解决上述问题。该系统在水电工程施工中的成功应用,可对其他类似地下复杂施工工程提供参考和借鉴。
关键词: TSP203, 超前地质预报系统, 不良地质洞段, 超前预报技术, 水电站引水隧洞, 消耗
Abstract: In construction of diversion tunnel of hydropower station or other underground chamber, the collapse, the solution cavity, high pressure surging water, large fault and other adverse geologic sections often appear, which cause large potential hazard for construction safety. Usually the geological drilling was adopted to explore the geologic situation ahead, but this method can explore only shorter distance and consume longer time. The use of TSP203 advanced geologic prediction system can solve abovementioned problems effectively. The successful application of this system in construction of hydropower engineering has provided reference for other similar underground complex project construction.
Key words: TSP203 advanced geologic prediction system, adverse geologic section, advanced geologic prediction technology, diversion tunnel of hydropower station, consume
黄超;侯忠发. TSP203超前地质预报系统在立洲电站引水洞的应用[J]. 华电技术, 2011, 33(4): 18-21.
HUANG Chao;HOU Zhongfa. Application of TSP203 advanced geologic prediction system in diversion tunnel of Lizhou Hydropower Station[J]. Huadian Technology, 2011, 33(4): 18-21.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: https://www.hdpower.net/CN/
https://www.hdpower.net/CN/Y2011/V33/I4/18