华电技术 ›› 2011, Vol. 33 ›› Issue (9): 50-52.

• 技术交流 • 上一篇    下一篇

300MW机组汽轮机转速控制故障分析和处理措施

李兴照,宋国锋,陈淑琴,海广星   

  1. 河南第一火电建设公司, 河南郑州450012
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-09-25 发布日期:2011-09-25

Analysis on fault of rotary speed control of 300MW unit steam turbine and treatment measures

LI Xingzhao, SONG Guofeng, CHEN Shuqin, HAI Guangxing   

  1. Henan First Thermal Electric Power Construction Company, Zhengzhou 450012, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-09-25 Published:2011-09-25

摘要: 巩义豫联电厂300MW机组汽轮机在停机惰走期间再次挂闸时,调门突然开大、转速迅速飞升导致汽轮机的超速保护(OPC)动作,针对上述现象进行了分析和处理,取得了良好的效果。

关键词: 数字电液控制系统, 停机惰走, PID调节器, 超速保护, 故障分析

Abstract: In Gongyi Yulian Power Plant, when the 300MW unit turbine was latched on again during its coasting operation after it was shutdown, the opening of the adjust gate was increased suddenly and rapidly; the rotate speed of the turbine was increased sharply; and the overspeed protection of the turbine was acted. The problems mentioned above were analyzed and treated, and favorable effect was obtained.

Key words: digital electro hydraulic control system (DEH), coasting operation after shutdown, PID adjuster, overspeed protection, fault analysis